Installation of dual CAT commercial generator systems at an occupied hospital campus. LaCreek coordinated full electrical infrastructure including dedicated concrete pads, fuel systems, transfer switch integration, and protective bollard installation — all completed with active hospital operations continuing on site. Work required strict safety planning and infection control protocols throughout the project.